SCSO carried out all Architectural Works in Turbine Building and supplied all required materials and provide all required machinery and equipment to execute the Works.
SERVICES PROVIDED BY SCSO.
Supply and provide of all required tools, hand tools, consumables, materials.
Providing all required health and safety materials (including but not limited to; all safety warning signs, tags, band, strip and all required health and safety materials) and ensure use of health and safety materials
Supply, installation, checking, inspection, maintenance, modification and dismantling of scaffolding required for execution of the Works.
Removing of rubbish and scrap materials.
Surface preparation and cleaning before applying the painting or vinyl plastic
Repairing the damage concrete in turbine house area
Supply and install vinyl plastic floor for the turbine house area
Dismantling storage room in the ground floor of boiler and remove all materials and transport to storage area of Hartha Power Station.