SCSO provided periodical air measurements in accordance with the Turkish and international regulations at the Site and were ensure and keep the Site air asbestos concentration below 0,1 fiber/cm3 during the execution of the Works.
The Scope of Works includes but not limited to:
The Repair Work Procedures of the Damaged Concrete at the Entrance of Stack was including but not limited to: